JPL
Careers
Education
Science & Technology
JPL Logo
JPL Logo
Solar System.

Phoenix Mars Lander - Countdown to Launch

Jet Propulsion Laboratory https://www.jpl.nasa.gov/ Sept. 25, 2007
On Saturday August 4, the Mars Phoenix spacecraft launched from Cape Canaveral, Florida.

Transcript

The Challenges of Getting to Mars

Phoenix Mars Lander:
Countdown to Launch

(Deborah Bass)
Phoenix is a lander that's going to the north polar highlands of Mars. . .

. . .to look for evidence of. . .

. . .habitable zones, places where life might have existed in the past.

(music)
(Matt Cox)
We're going to be repeating a number of tests that we did back in Denver...

both to fully check out the spacecraft after the shipment. . .

... as well as take on some minor updates to the software that we've been testing with overall.

Once we get out into June, then, we've got a month where we'll be installing the ordinance...

...and explosives onto the spacecraft that it needs to both separate itself and deploy the parachute.

(music)
(James Young)
This phase of the mission is basically the final checkouts and close-outs of the vehicle,

in preparation to mate it to the third stage, and to transport it out to the pad,

and get it stacked on the rocket and, of course, get it launched.
(Matt Cox)
The most challenging part is, as you get closer and closer to the end,

there's less and less room to recover if something doesn't go right, so...

you know, it's really just managing things, and being on top of every little item,

because there's a point there where you can't recover, and we don't want to get to that point.

(thunder)
(Joel Tumbiolo)
The biggest challenge this week is actually not the launch window per-se because it's an early morning launch,

but we are in our peak afternoon thunderstorm time of the year.

So the biggest challenges are the propellant loading that is taking place on the pad over the last couple of days,

and it's been cancelled because of the thunderstorms.

(music, rain)
(Rob Chambers)
We were supposed to load oxidizer and then fuel onto the second stage of the launch vehicle today.

And they got through the oxidizer load, and then the prediction for weather this afternoon was not good,

so they decided to stand down from loading fuel which means they have to load fuel tomorrow.

And because of that, we'll likely slip spacecraft launch from what was planned to be Friday morning to Saturday morning.
(Leslie Tamppari)
We have two days of our launch window before we have to stand down for the Shuttle launch.

And so, we're hoping that we either get off in the first two days, or the Shuttle gets off in its first days...

...so that then we can start planning to launch right after the Shuttle.

(music)

Text: Saturday, August 4, 2007 -- Cape Canaveral, Florida, 5:26 a.m.
(NASA Announcer)
seven...

...six...

...five...

...four...

...main engine start...
(explosion)
...two...

...one...

...zero and liftoff of the Delta 2 rocket with Phoenix,

a distant science outpost seeking clues to the evolution at the polar region of Mars.

(rocket engine rumble)

(music)
(James Young)
Being on the program as long as I have, it's kind of like your kid going off to college.

You're very excited, you're very happy, but also sad that, uh...

...you know, your baby's basically going to go away.

And, you know, you're not going to hear from it again for eight or nine months.

(music)

There's a lot of joy, a lot of sadness, a lot of nervousness.

But that's part of the job, and we all deal with it in different ways.

(music)

Related Pages

Image.

NASA’s Curiosity Rover Frees Its Drill From a Rock

Image.

NASA’S Juno Misson Captures Jupiter Moon Thebe

Image.

Odyssey Team Celebrates on a Global Map of Mars

Image.

NASA’s Perseverance Mars Rover Surveys ‘Crocodile Bridge’

News.

NASA’s Perseverance, Curiosity Panoramas Capture Two Sides of Mars

Image.

Six Years of Curiosity’s Wheels on the Move

Image.

Curiosity Captures a 360-Degree View at ‘Nevado Sajama’

News.

NASA’s Curiosity Finds Organic Molecules Never Seen Before on Mars

Infographic.

Pi in the Sky: A Pi Day Infographic

News.

NASA Shuts Off Instrument on Voyager 1 to Keep Spacecraft Operating

About JPL
Who We Are
Directors
Careers
Internships
The JPL Story
JPL Achievements
Documentary Series
JPL Annual Report
Executive Council
Missions
Current
Past
Future
All
News
All
Earth
Solar System
Stars and Galaxies
Eyes on the News
Subscribe to JPL News
Galleries
Images
Videos
Audio
Podcasts
Apps
Visions of the Future
Slice of History
Robotics at JPL
Events
Lecture Series
Speakers Bureau
Calendar
Visit
Public Tours
Virtual Tour
Directions and Maps
Topics
JPL Life
Solar System
Mars
Earth
Climate Change
Exoplanets
Stars and Galaxies
Robotics
More
Asteroid Watch
NASA's Eyes Visualizations
Universe - Internal Newsletter
Social Media
Accessibility at NASA
Contact Us
Get the Latest from JPL
Follow Us

JPL is a federally funded research and development center managed for NASA by Caltech.

More from JPL
Careers
Education
Science & Technology
Acquisition
JPL Store
Careers
Education
Science & Technology
Acquisition
JPL Store
Related NASA Sites
Basics of Spaceflight
NASA Kids Science - Earth
Earth / Global Climate Change
Exoplanet Exploration
Mars Exploration
Solar System Exploration
Space Place
NASA's Eyes Visualization Project
Voyager Interstellar Mission
NASA
Caltech
Privacy
Image Policy
FAQ
Feedback
Version: v3.1.0 - 9d64141
Site Managers:Emilee Richardson, Alicia Cermak
Site Editors:Naomi Hartono, Steve Carney
CL#:21-0018