JPL
Careers
Education
Science & Technology
JPL Logo
JPL Logo
Solar System
.2 min read

NASA Briefing for Supersonic Saucer-Shaped Vehicle

Jet Propulsion Laboratory https://www.jpl.nasa.gov/ May 15, 2014
NASA workers at the agency's Jet Propulsion Laboratory, wearing clean room "bunny suits," prepare the Low-Density Supersonic Decelerator (LDSD) test article for shipment later this month to Hawaii. LDSD will help land bigger space payloads on Mars or return them back to Earth.› Full image and caption
Credit: NASA/JPL-Caltech

A mission overview briefing about NASA's upcoming flight test of the Low-Density Supersonic Decelerator (LDSD) experiment will be provided to reporters attending a media day on Monday, June 2, at the U.S. Navy's Pacific Missile Range Facility (PMRF) on Kauai, Hawaii.

A mission overview briefing about NASA's upcoming flight test of the Low-Density Supersonic Decelerator (LDSD) experiment will be provided to reporters attending a media day on Monday, June 2, at the U.S. Navy's Pacific Missile Range Facility (PMRF) on Kauai, Hawaii. The public can watch the briefing via live streaming, at 11 a.m. PDT (2 p.m. EDT/8 a.m. HST).

NASA's LDSD test is designed to investigate breakthrough technologies that will benefit landing future human and robotic Mars missions, as well as aid in safely returning large payloads to Earth. The NASA LDSD test over the Pacific Ocean will simulate the entry, descent and landing speeds a spacecraft would be exposed to when flying through the Martian atmosphere. During the test, a large saucer-shaped disk carrying an inflatable inner-tube-shaped decelerator and parachute system will be carried to an altitude of 120,000 feet (37 kilometers) by a giant balloon. After release from the balloon, rockets will lift the disk to 180,000 feet (55 kilometers) while reaching supersonic speeds. Traveling at 3.75 times the speed of sound, the saucer's decelerator will inflate, slowing the vehicle, and then a parachute will deploy to carry it to the ocean's surface.

Briefing participants will include:

-- Capt. Bruce Hay USN, commanding officer, Pacific Missile Range Facility, Kauai, Hawaii

-- Michael Gazarik, associate administrator of the Space Technology Mission Directorate, NASA Headquarters, Washington

-- Mark Adler, LDSD project manager, NASA's Jet Propulsion Laboratory, Pasadena, California

-- Ian Clark, LDSD principal investigator, JPL

The briefing will be streamed live on the agency's website at:

http://www.nasa.gov/nasatv

It will also be carried live on:

http://www.ustream.tv/nasajpl2

NASA has six potential dates for launch of the high-altitude balloon carrying the LDSD experiment: June 3, 5, 7, 9, 11 and 14. The launch window for each date extends from 7 a.m. to 8:30 a.m. HST.

NASA's LDSD carries several onboard cameras. It is expected that video of selected portions of the test, including the rocket-powered ascent, will be downlinked and streamed live to several NASA websites, including:

http://www.nasa.gov/nasatv

and

http://www.ustream.tv/nasajpl2

Decisions to attempt launch of the LDSD test will be made the day before each launch opportunity date. NASA will issue launch advisories via social media -- @NASA_Technology and @NASA - as well as the mission website and news media advisories.

For more information about NASA's LDSD, visit the mission page at:

http://go.usa.gov/kzZQ

NASA's LDSD program is part of the agency's Space Technology Mission Directorate, which is innovating, developing, testing and flying hardware for use in NASA's future missions. For more information about NASA's investment in space technology, visit:

http://www.nasa.gov/spacetech

Media Contacts

DC Agle

Jet Propulsion Laboratory, Pasadena, Calif.

818-393-9011

agle@jpl.nasa.gov

David E. Steitz

(202) 358-1730

Stefan Alford

808-335-4740

stefan.alford@navy.mil

2014-149

Related News

Solar System.

NASA Testing Advanced Capabilities for Moon, Mars Rovers

Solar System.

NASA’s Psyche Mission Aces Mars Flyby, Targets Metal-Rich Asteroid

Mars.

NASA’s Perseverance Rover Snaps Selfie in Mars’ Western Frontier

Mars.

NASA’s Perseverance, Curiosity Panoramas Capture Two Sides of Mars

Mars.

NASA’s Curiosity Finds Organic Molecules Never Seen Before on Mars

Solar System.

NASA Shuts Off Instrument on Voyager 1 to Keep Spacecraft Operating

Asteroids and Comets.

NASA’s DART Mission Changed Orbit of Asteroid Didymos Around Sun

Mars.

NASA’s Curiosity Rover Sees Martian ‘Spiderwebs’ Up Close

Mars.

NASA’s Perseverance Now Autonomously Pinpoints Its Location on Mars

Mars.

NASA’s Perseverance Rover Completes First AI-Planned Drive on Mars

About JPL
Who We Are
Directors
Careers
Internships
The JPL Story
JPL Achievements
Documentary Series
JPL Annual Report
Executive Council
Missions
Current
Past
Future
All
News
All
Earth
Solar System
Stars and Galaxies
Eyes on the News
Subscribe to JPL News
Galleries
Images
Videos
Audio
Podcasts
Apps
Visions of the Future
Slice of History
Robotics at JPL
Events
Lecture Series
Speakers Bureau
Calendar
Visit
Public Tours
Virtual Tour
Directions and Maps
Topics
JPL Life
Solar System
Mars
Earth
Climate Change
Exoplanets
Stars and Galaxies
Robotics
More
Asteroid Watch
NASA's Eyes Visualizations
Universe - Internal Newsletter
Social Media
Accessibility at NASA
Contact Us
Get the Latest from JPL
Follow Us

JPL is a federally funded research and development center managed for NASA by Caltech.

More from JPL
Careers
Education
Science & Technology
Acquisition
JPL Store
Careers
Education
Science & Technology
Acquisition
JPL Store
Related NASA Sites
Basics of Spaceflight
NASA Kids Science - Earth
Earth / Global Climate Change
Exoplanet Exploration
Mars Exploration
Solar System Exploration
Space Place
NASA's Eyes Visualization Project
Voyager Interstellar Mission
NASA
Caltech
Privacy
Image Policy
FAQ
Feedback
Version: v3.1.3 - 5e83a9a
Site Managers:Emilee Richardson, Alicia Cermak
Site Editors:Naomi Hartono, Steve Carney
CL#:21-0018