JPL
Careers
Education
Science & Technology
JPL Logo
JPL Logo

Missions

Search Missions

Showing 1–12 of 25 results

Target
Status
Topic
Type
Date
  1. MissionCategory: Mission.|futureCategory: future.
    MissionCategory: Mission.|futureCategory: future.

    Farside Seismic Suite

    Farside Seismic Suite will deliver two sensitive seismometers to the far side of the Moon, where they will measure far-side moonquakes and meteor impacts for the first time ever. .

    Launch date: 2027

  2. MissionCategory: Mission.|futureCategory: future.
    MissionCategory: Mission.|futureCategory: future.

    CADRE

    A trio of small rovers will work as a team to explore the Moon autonomously, mapping the subsurface in 3D, collecting distributed measurements, and showing the potential of multirobot missions. .

    Launch date: 2026

  3. MissionCategory: Mission.|futureCategory: future.
    MissionCategory: Mission.|futureCategory: future.

    MoonFall

    NASA’s MoonFall mission will blaze a path for future science and human exploration of the Moon by sending four JPL-built propulsive drones to survey the lunar surface at potential Artemis landing sites in unprecedented detail. MoonFall will help establish a sustained U.S. presence in the lunar South Pole region. .

    Published: May 26, 2026

  4. MissionCategory: Mission.|pastCategory: past.
    MissionCategory: Mission.|pastCategory: past.

    Lunar Trailblazer

    NASA’s Lunar Trailblazer mission would have provided new insights into the lunar water cycle. .

    Launch date: Feb. 26, 2025

  5. MissionCategory: Mission.|pastCategory: past.
    MissionCategory: Mission.|pastCategory: past.

    Lunar Flashlight

    Roughly the size of a briefcase, Lunar Flashlight is a very small satellite being developed and managed by NASA's Jet Propulsion Laboratory that will use near-infrared lasers and an onboard spectrometer to map ice in permanently shadowed regions near the Moon's south pole. .

    Launch date: Dec. 11, 2022

  6. MissionCategory: Mission.|pastCategory: past.
    MissionCategory: Mission.|pastCategory: past.

    GRAIL

    The Gravity Recovery and Interior Laboratory, or GRAIL, mission was designed to create the most accurate gravitational map of the moon to date, which when combined with topographic data, can provide insight into the moon's internal structure, composition and evolution. .

    Launch date: Sept. 10, 2011

  7. MissionCategory: Mission.|currentCategory: current.
    MissionCategory: Mission.|currentCategory: current.

    Diviner Lunar Radiometer Experiment

    An instrument flying aboard NASA's Lunar Reconnaissance Orbiter, the Diviner Lunar Radiometer Experiment is designed to measure surface temperatures on the moon, providing key information for future lunar surface operations and exploration. .

    Launch date: June 18, 2009

  8. MissionCategory: Mission.|pastCategory: past.
    MissionCategory: Mission.|pastCategory: past.

    Moon Mineralogy Mapper

    The Moon Mineralogy Mapper, or M3, instrument flew aboard Chandrayaan-1, India's first mission to the moon, and provided the first mineralogical map of the lunar suface. .

    Launch date: Oct. 22, 2008

  9. MissionCategory: Mission.|pastCategory: past.
    MissionCategory: Mission.|pastCategory: past.

    Surveyor 7

    Surveyor 7 was the last of the original series of Surveyor moon landers of the late 1960s and was dedicated primarily to scientific investigations. .

    Launch date: Jan. 7, 1968

  10. MissionCategory: Mission.|pastCategory: past.
    MissionCategory: Mission.|pastCategory: past.

    Surveyor 6

    Part of the highly successful series of lunar landers sent to the moon to examine the feasibility of a future human mission, Surveyor 6 was the first spacecraft to be launched from the surface of the moon. .

    Launch date: Nov. 7, 1967

  11. MissionCategory: Mission.|pastCategory: past.
    MissionCategory: Mission.|pastCategory: past.

    Surveyor 5

    Equipped with a chemical element analyzer for conducting analyses of the lunar soil, the Surveyor 5 lander was the first spacecraft to do a soil analysis on the moon, or any other world. .

    Launch date: Sept. 8, 1967

  12. MissionCategory: Mission.|pastCategory: past.
    MissionCategory: Mission.|pastCategory: past.

    Surveyor 4

    Despite a perfect flight to the moon, Surveyor 4, which was designed to conduct further studies of the lunar surface in preparation for the upcoming Apollo missions, met an untimely end just 2.5 minutes before landing on the moon. .

    Launch date: July 14, 1967

Page 1 of 3
About JPL
Who We Are
Directors
Careers
Internships
The JPL Story
JPL Achievements
Documentary Series
JPL Annual Report
Executive Council
Missions
Current
Past
Future
All
News
All
Earth
Solar System
Stars and Galaxies
Eyes on the News
Subscribe to JPL News
Galleries
Images
Videos
Audio
Podcasts
Apps
Visions of the Future
Slice of History
Robotics at JPL
Events
Lecture Series
Speakers Bureau
Calendar
Explore JPL
Visit
Public Tours
Virtual Tour
Directions and Maps
Explore JPL
Topics
JPL Life
Solar System
Mars
Earth
Climate Change
Exoplanets
Stars and Galaxies
Robotics
More
Asteroid Watch
NASA's Eyes Visualizations
Universe - Internal Newsletter
Social Media
Accessibility at NASA
Contact Us
Get the Latest from JPL
Follow Us

JPL is a federally funded research and development center managed for NASA by Caltech.

More from JPL
Careers
Education
Science & Technology
Acquisition
JPL Store
Careers
Education
Science & Technology
Acquisition
JPL Store
Related NASA Sites
Basics of Spaceflight
NASA Kids Science - Earth
Earth / Global Climate Change
Exoplanet Exploration
Mars Exploration
Solar System Exploration
Space Place
NASA's Eyes Visualization Project
Voyager Interstellar Mission
NASA
Caltech
Privacy
Image Policy
FAQ
Feedback
Version: v3.2.0 - f0b8d8a
Site Managers:Emilee Richardson, Alicia Cermak
Site Editors:Steve Carney
CL#:21-0018