JPL
Careers
Education
Science & Technology
JPL Logo
JPL Logo
Solar System.

LDSD: The Great Shakeout Test For Mars

Jet Propulsion Laboratory https://www.jpl.nasa.gov/ June 3, 2014

Your browser cannot play the provided video file(s).

NASA readies for the experimental flight of a test vehicle designed for landing larger payloads on Mars.

Transcript

MARK ADLER: In order to land things on Mars, we need to slow them down before they hit the surface. We use the Martian atmosphere to do that but the Martian atmosphere is very, very thin - it's only 1% as thick as Earth's atmosphere, so these decelerators have to go out very high speeds at Mars, at supersonic speed and have to be very large to slow the vehicle even down to speeds of a couple of hundred miles an hour.

IAN CLARK: What we have are an inflatable aerodynamic decelerator - that's the soft goods, this yellow textile article that you see in the side. And what will happen is that this will inflate very rapidly at a fraction of a second, about a third of second and it will increase the size of the aeroshell and it will create a surface much larger than the vehicle alone with which we can react against the atmosphere and generate more drag and slow the vehicle down further.

MICHAEL GAZARIK: What we have out at the test range off of Hawaii is an ability of the infrastructure to be able to do this testing safely, effectively and efficiently.

Mark Adler: In the background here, we have our launch tower. We launch a large scientific balloon, a 34 million cubic foot helium balloon that carries our 7,000 lb. test vehicle up to a 120,000 feet in the atmosphere. That vehicle has on it a large rocket motor which then fires and takes the vehicle even higher up to 160 to 180,000 feet where the atmosphere is like it is at Mars where we'd use these decelerators and then it's going about sideways we deploy at Mach 4 the first decelerator which we call the SIAD - our supersonic inflatable aerodynamic decelerator - it's a large tube that inflates around the vehicle. That slows it down to Mach 2 1/2. At Mach 2 ½, we deploy a large 30-meter parachute. Those are the two technologies that we're testing. This is a shakeout test to see if we can get the vehicle up to the proper conditions.

Whatever happens after that point - if the vehicle goes off-course or if it doesn't reach the trajectory that we want or we don't get the conditions we want or the cameras aren't working or any of those things - those are exactly what we're looking for to learn what happens, take that information, incorporate it into the next two flights that we have next to do.

GAZARIK: Some would argue in technology development that if you don't push the boundary a little bit you'll never learn. So we have to take the right amount of risk. We do the right calculations, we do good engineering but we are pushing the boundaries with these technologies.

ADLER: My boss told me that if this thing works perfectly, if it does exactly what we expected it to do, it exactly hits the targets that we want, it flies that way we want, it gets the data back exactly like we want, all the cameras work, all of that then I get an A. But if we have some failures, if we have some problems, if we see things that we learn from that we can apply to the next flight, then I get an A+

Download m4v

Related Pages

Image.

Curiosity Finds Evidence of an Ancient Sandstorm

Image.

NASA’s Perseverance Rover Provides Sweeping View of Broom Point

Image.

Perseverance’s Trip to ‘Broom Point’

Mission.

Voyager 1

Image.

NASA’s HiRISE Captures Perseverance Marking a Milestone on Mars

News.

NASA Testing Advanced Capabilities for Moon, Mars Rovers

Image.

Slice of History - Fly Me to the Moon

Mission.

MoonFall

Mission.

Surveyor 1

News.

NASA’s Psyche Mission Aces Mars Flyby, Targets Metal-Rich Asteroid

About JPL
Who We Are
Directors
Careers
Internships
The JPL Story
JPL Achievements
Documentary Series
JPL Annual Report
Executive Council
Missions
Current
Past
Future
All
News
All
Earth
Solar System
Stars and Galaxies
Eyes on the News
Subscribe to JPL News
Galleries
Images
Videos
Audio
Podcasts
Apps
Visions of the Future
Slice of History
Robotics at JPL
Events
Lecture Series
Speakers Bureau
Calendar
Visit
Public Tours
Virtual Tour
Directions and Maps
Topics
JPL Life
Solar System
Mars
Earth
Climate Change
Exoplanets
Stars and Galaxies
Robotics
More
Asteroid Watch
NASA's Eyes Visualizations
Universe - Internal Newsletter
Social Media
Accessibility at NASA
Contact Us
Get the Latest from JPL
Follow Us

JPL is a federally funded research and development center managed for NASA by Caltech.

More from JPL
Careers
Education
Science & Technology
Acquisition
JPL Store
Careers
Education
Science & Technology
Acquisition
JPL Store
Related NASA Sites
Basics of Spaceflight
NASA Kids Science - Earth
Earth / Global Climate Change
Exoplanet Exploration
Mars Exploration
Solar System Exploration
Space Place
NASA's Eyes Visualization Project
Voyager Interstellar Mission
NASA
Caltech
Privacy
Image Policy
FAQ
Feedback
Version: v3.1.3 - 5e83a9a
Site Managers:Emilee Richardson, Alicia Cermak
Site Editors:Naomi Hartono, Steve Carney
CL#:21-0018