Jet Propulsion Laboratory Home Page
Jet Propulsion Laboratory Website National Aeronautics and Space Administration CalTech Home Page
JPL Home Page Earth Solar System Stars and Galaxies Technology Search
Images and Videos News Missions Events Kids Education Scientists and Engineers About JPL
Upper-left corner   Upper-right corner
  NEWS
Dot PRESS RELEASES

Dot PRESS KITS

Dot FACT SHEETS

Dot FEATURES

Dot PROFILES

Dot IMAGES / VIDEOS

Dot MEDIA VISITS

Dot MEDIA CONTACTS

Dot EMPLOYEE NEWSPAPER

 
2001 News Releases

Mars Odyssey Mission Status
October 23, 2001

artist's concept of Mars Odyssey orbit insertion
Artist's concept of Mars Odyssey orbit insertion
Browse image JPEG
Odyssey web site
Orbit insertion webcast
Odyssey team in control room

       The United States returned to Mars tonight as NASA's 2001 Mars Odyssey fired its main engine at 7:26 p.m. Pacific time and was captured into orbit around the red planet.

       At 7:55 p.m. Pacific time, flight controllers at the Deep Space Network station in Goldstone, Calif., and Canberra, Australia, picked up the first radio signal from the spacecraft as it emerged from behind the planet Mars.

       "Early information indicates everything went great," said Matt Landano, the Odyssey project manager at NASA's Jet Propulsion Laboratory in Pasadena. "The orbit insertion burn went off just as we planned and we will now begin the three-month long aerobraking phase."

       Through tonight and the early morning hours tomorrow, the flight team will be analyzing the information they are receiving from Odyssey. This will help them evaluate the health and status of the spacecraft and determine the precise orbit geometry.

       Tonight's firing of the main engine slowed the spacecraft's speed and allowed it to be captured by Mars' gravity into an egg-shaped elliptical orbit around the planet. In the weeks and months ahead, the spacecraft will repeatedly brush against the top of the atmosphere in a process called aerobraking. By using atmospheric drag on the spacecraft, flight controllers will reduce the long, highly elliptical orbit into a shorter, 2-hour circular orbit of approximately 400 kilometers (about 250 miles) altitude for the mission's science data collection.

       "Orbit insertion is our single most critical event during the mission, and we are glad it's behind us," said David A. Spencer, Odyssey's mission manager at JPL. "But we cannot rest on our laurels. The aerobraking phase will be a demanding, around-the-clock operation, and it requires the flight team to react as the atmosphere of Mars changes."

       The aerobraking phase is scheduled to begin on Friday, October 26.

       JPL manages the 2001 Mars Odyssey mission for NASA's Office of Space Science, Washington, D.C. Principal investigators at Arizona State University in Tempe, the University of Arizona in Tucson, and NASA's Johnson Space Center, Houston, Texas, operate the science instruments. Lockheed Martin Astronautics, Denver, Colo., is the prime contractor for the project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena. NASA's Langley Research Center in Hampton, Va., will provide aerobraking support to JPL's navigation team during mission operations.


Contacts: JPL/Mary Hardin (818) 354-0344

Bottom-left corner   Bottom-right corner  

Privacy / Copyright FAQ Feedback Site Map